India Orders Captive Coal Plants to Maximize Output

India has ordered over 100 captive coal-fired power plants to operate at maximum capacity from October through December. The emergency directive aims to meet surging electricity demand driven by rising temperatures and industrial activity.

Xurve View
رؤى:
Smoke billows from the cooling towers of Torrent Power's coal-fired power plant in Ahmedabad, India, February 16, 2026.REUTERS/Amit Dave

India ordered more than 100 captive coal-fired power plants to run at maximum capacity from October 1 through year-end to cover surging electricity demand. The emergency directive targets facilities with an installed capacity of at least 50 megawatts. The move comes as rising temperatures drive up power consumption nationwide.

IUX24

يقدّم IUX24 أخبارًا متعمقة للمال والاقتصاد والاستثمار، مدعومة بالذكاء الاصطناعي لإبراز الإشارات المهمة عبر الأسواق العالمية.

IFZA Properties, Dubai Silicon Oasis, DSO-IFZA, Dubai, United Arab Emirates

Copyright IUX24 MEDIA - FZCO. جميع الحقوق محفوظة.

مدعوم بالذكاء الاصطناعي • مصنوع بدقة

IUX24 هي منصة معلومات وتحليلات تقدّم الأخبار وبيانات السوق والأدوات التحليلية والميزات المدعومة بالذكاء الاصطناعي لأغراض معلوماتية وتعليمية. لا تشكّل الخدمات والمعلومات المقدَّمة نصيحة استثمارية أو إشارات تداول أو خدمات وساطة. ينطوي الاستثمار على مخاطر، وينبغي للمستخدمين تقييم المعلومات بعناية قبل اتخاذ قرارات الاستثمار.