Capstone Copper to resume full production at Mantoverde mine as Chile strike ends

Capstone Copper reached a labor deal at its Mantoverde mine in Chile. This agreement ends a strike and allows production to return to normal levels today.

洞察:
Union No. 2, the largest labour organization at the Mantoverde copper-gold mine in Chile CLCL, has approved a new three-year labour contract, effectively ending a strike that began on January 2. This agreement clears the way for Capstone Copper to resume full operations at the facility. During the period of industrial action, production at the mine had been reduced to approximately 55% of its normal levels.
The Mantoverde copper-gold mine is a significant asset within the global copper industry. In 2025, the site produced 62,308 tonnes of copper concentrate and 32,807 tonnes of copper cathodes, accounting for roughly 0.4% of total global copper production. Capstone Copper, which maintains interests in Canada CACA and Australia AUAU, has now successfully reached labour agreements with all four unions at the site, including the largest, Union No. 2.
IUX24

IUX24 提供深度財經、經濟與投資資訊,借助 AI 挖掘全球市場中最重要的訊號。

IFZA Properties, Dubai Silicon Oasis, DSO-IFZA, Dubai, United Arab Emirates

Copyright IUX24 MEDIA - FZCO. 版權所有。

由 AI 驅動 • 精益求精

IUX24 是一個資訊與分析平台,提供新聞、市場資料、分析工具及 AI 驅動的功能,僅供資訊參考與教育用途。所提供的服務和資訊不構成投資建議、交易訊號或經紀服務。投資涉及風險,使用者在做出投資決定前應審慎評估相關資訊。